Wind Farm Tera Kora
Two existing wind farms in Curacao at Tera Korá, 12 turbines installed in 1992, and Playa Kanoa, 18 turbines installed in 1999, were replaced by 10 turbines of the 3 MW class. On behalf of NuCapital, ABT was involved as engineers and for the foundation design. The new wind turbines have a hub height of 80 metres and a rotor diameter of 90 metres. The project was executed in a very short period between May 2010 and December 2010, almost 5 months shorter than usual.
{"markers":[{"lat":12.198095,"lng":-68.983154,"mType":null,"radius":0,"content":null}]}