Windplanblauw is located on the north-east side of Flevoland in the area of Swifterbant and Dronten. This is where Vattenfall, in cooperation with SwifterwinT and Molenrak B.V. is realizing Windplanblauw. The plan involves the replacement of 74 old wind turbines for 61 new ones, which are larger and more powerful. The project consists of two parts, namely the onshore part consisting of 37 wind turbines supplied by Vestas type EnVentus 5.6MW, and 24 wind turbines located in the IJsselmeer (Nearshore) supplied by GE, type Cypress 5.5MW. Operationally, the entire wind farm will have a capacity of about 340MW, enough yield the electricity consumption of 450,000 households (about 1.0mln people).
WindplanBlauw consist out of 5 contracts namely:
1. Contract WTG supplier Onshore
2. BOP Onshore
3. WTG Supplier Nearshore
4. BOP Nearshore
5. Substation
WindBase was involved in all the contracts, which included:
1. Contract WTG supplier Onshore, Qa/Qc of the coatings, Welding of the tower, and the stairs but also problems which occurred during the lifting process..
2. BOP Onshore, Active assessment of the design, risk controlled design review but also on the work method plans, maintenance plans and inspection plans
3. WTG Supplier Nearshore, visiting tower fabrication process, QA/Qc steel towers and coating inspections
4. BOP Nearshore, Engineering Bases of design, Active assessment of the design and risk controlled design review en inspections during construction.
5. Substation Active assessment of the design, risk controlled design review but also on the work method plans, maintenance plans and inspection plans
Request for our references
When you want to know more specifics about our reference projects please don't hesitate to contact us.